I'm excited about the art studio--its coming right along. If you look on the left hand side you'll see a 12' section of stud wall that has no batting. The 12' wall will be removed next spring and an 8' x 12' dormer will be added. There will be a matching 8' x 12' dormer on the right as well.
We haven't quite made the decision yet between building an elevator, or building stairs to the studio. We'll see what happpens in the spring. In the meantime, we have a hole cut in the floor and access the studio with a ladder.
This weekend we insulated the ceiling, walls, and installed vapor barrier. Pictured here is my friend Pam, also an artist--who came to help us install insulation. Burrrrr, it was really cold here in Wisconsin today.
c. 1850 Schoolhouse in Alton, NH
-
$150,000 - This charming 1850's schoolhouse has so many possibilities. The
property has a lot of history but is ready to start a new chapter. Located
on a...